Problem

Merging #139 built the thinkpad image three times: the PR job, the push-to-main job, then cjust image-rebuild. CI deleted both of its builds right after verifying them. Then cjust image-rebuild hung forever: it followed the log with journalctl -f, which doesn't exit when the service finishes, so its chained image-upgrade never ran.

Change

Build once, promote on merge (ci.yml thinkpad-image job → new hosts/bees/thinkpad-image-ci.sh):

  • PR: build, then the shared verify gates, then push the verified image to zot as cn/thinkpad-host:ctx-<git tree hash of hosts/thinkpad/host-image>. A ctx-* tag only exists if the gates passed.
  • Merge: copy that exact image's manifest to its version tag and to :stable. This is a registry-side retag: seconds, no rebuild, and it ships the bytes that passed review. After a merge, once the job is green, cjust image-upgrade on think is all you need.
  • Fallback: if there's no candidate, or a nightly has published something newer since the PR built (staleness guard compares build stamps), it runs the nightly unit with systemctl start --wait.
  • Keyed on the build-context tree hash, not the commit. The PR's merge-ref build stays promotable when unrelated commits land on main in between. Any change to the image directory means a new key and a fresh build.

zot: keep the last 5 ctx-* candidates. Adds restartTriggers on zot.service so retention edits apply when bees deploys, not at the next reboot (nothing did this before).

cjust image-rebuild: waits with systemctl start --wait while streaming the log, then stops the tail, so the image-upgrade step actually runs. Docs now point to "after a merge: cjust image-upgrade"; image-rebuild is for pulling in today's Fedora updates.

The nightly is unchanged (it's still the daily base-image and dnf refresh).

Verification

  • shellcheck 0.11 is clean on the new script, the build script, and the extracted image-rebuild recipe body.
  • Tested the promote logic against a fake OCI registry (same manifest and blob API calls the script makes against zot):
    • A: fresh candidate. Retagged; stable, the version tag and ctx-* end up with the same config digest.
    • B: no candidate. Falls back to systemctl start --wait thinkpad-image-build.service.
    • C: candidate older than :stable. Falls back to a fresh build.
    • D: empty registry. Retagged.
    • E: PR mode. Order confirmed as build, then verify, then push; nothing is pushed if verify fails (set -e).
  • On bees: the runner user (crussell) has passwordless sudo for systemctl, and zot's tag listing is reachable over Nebula. zot currently holds stable plus four 44-* tags; ctx-* doesn't collide with the existing ^[0-9]+- retention pattern.

Self-test

This PR changes thinkpad-image-ci.sh, which is now in the path filter, so the thinkpad-image job runs on this PR in pr mode and pushes a ctx-* candidate. Merging it exercises promote for real.

Accepted risk

Retagging uses the plain registry API (curl PUT of the manifest), since the runner has no skopeo or jq. zot is Nebula-only and unauthenticated, the same trust model the nightly's podman push already relies on.

## Problem Merging #139 built the thinkpad image three times: the PR job, the push-to-main job, then `cjust image-rebuild`. CI deleted both of its builds right after verifying them. Then `cjust image-rebuild` hung forever: it followed the log with `journalctl -f`, which doesn't exit when the service finishes, so its chained `image-upgrade` never ran. ## Change **Build once, promote on merge** (`ci.yml` thinkpad-image job → new `hosts/bees/thinkpad-image-ci.sh`): - **PR:** build, then the shared verify gates, then push the verified image to zot as `cn/thinkpad-host:ctx-<git tree hash of hosts/thinkpad/host-image>`. A `ctx-*` tag only exists if the gates passed. - **Merge:** copy that exact image's manifest to its version tag and to `:stable`. This is a registry-side retag: seconds, no rebuild, and it ships the bytes that passed review. After a merge, once the job is green, `cjust image-upgrade` on think is all you need. - **Fallback:** if there's no candidate, or a nightly has published something newer since the PR built (staleness guard compares build stamps), it runs the nightly unit with `systemctl start --wait`. - **Keyed on the build-context tree hash, not the commit.** The PR's merge-ref build stays promotable when unrelated commits land on main in between. Any change to the image directory means a new key and a fresh build. **zot:** keep the last 5 `ctx-*` candidates. Adds `restartTriggers` on `zot.service` so retention edits apply when bees deploys, not at the next reboot (nothing did this before). **`cjust image-rebuild`:** waits with `systemctl start --wait` while streaming the log, then stops the tail, so the `image-upgrade` step actually runs. Docs now point to "after a merge: `cjust image-upgrade`"; `image-rebuild` is for pulling in today's Fedora updates. The nightly is unchanged (it's still the daily base-image and dnf refresh). ## Verification - `shellcheck` 0.11 is clean on the new script, the build script, and the extracted `image-rebuild` recipe body. - Tested the promote logic against a fake OCI registry (same manifest and blob API calls the script makes against zot): - **A: fresh candidate.** Retagged; `stable`, the version tag and `ctx-*` end up with the same config digest. - **B: no candidate.** Falls back to `systemctl start --wait thinkpad-image-build.service`. - **C: candidate older than `:stable`.** Falls back to a fresh build. - **D: empty registry.** Retagged. - **E: PR mode.** Order confirmed as build, then verify, then push; nothing is pushed if verify fails (`set -e`). - On bees: the runner user (crussell) has passwordless sudo for `systemctl`, and zot's tag listing is reachable over Nebula. zot currently holds `stable` plus four `44-*` tags; `ctx-*` doesn't collide with the existing `^[0-9]+-` retention pattern. ## Self-test This PR changes `thinkpad-image-ci.sh`, which is now in the path filter, so the thinkpad-image job runs on this PR in `pr` mode and pushes a `ctx-*` candidate. Merging it exercises `promote` for real. ## Accepted risk Retagging uses the plain registry API (`curl` PUT of the manifest), since the runner has no skopeo or jq. zot is Nebula-only and unauthenticated, the same trust model the nightly's `podman push` already relies on.
thinkpad image: build once, promote on merge; fix image-rebuild hang
All checks were successful
ci / changes (pull_request) Successful in 1s
ci / check (pull_request) Successful in 17s
ci / thinkpad-image (pull_request) Successful in 6m4s
d745cd30a2
Before: merging an image change built it three times (PR job, push-to-main
job, then the nightly / cjust image-rebuild). CI deleted both of its builds
right after verifying them, so a merge only reached the laptop after another
full build. cjust image-rebuild also never finished: it followed the build
log with journalctl -f, which doesn't exit when the service does, so its
chained image-upgrade never ran (Ctrl-C was the only way out).

Now:
- PR (ci.yml thinkpad-image): build, verify, then push the verified image to
  zot as cn/thinkpad-host:ctx-<git tree hash of hosts/thinkpad/host-image>.
- Merge: retag that exact image to :stable + its version tag. Registry-side
  manifest copy, seconds, no rebuild, and it ships the bytes that passed
  review. Falls back to the nightly unit (systemctl start --wait) if there is
  no candidate or a nightly published something newer since the PR built
  (staleness guard on the build stamps).
- Keyed on the build-context tree hash, so the PR's merge-ref build stays
  promotable when unrelated commits land on main in between.
- Logic in hosts/bees/thinkpad-image-ci.sh (shellcheck-clean; tested against
  a fake OCI registry: retag, no-candidate fallback, stale fallback, empty
  registry, PR build/verify/push order).
- zot: keep the last 5 ctx-* candidates; restartTriggers on zot.service so
  retention edits apply on deploy instead of the next reboot.
- cjust image-rebuild: wait with systemctl start --wait (log streamed
  alongside, then stopped), so the upgrade step actually runs. Docs now say
  'after a merge: cjust image-upgrade'.

The nightly is unchanged: still the daily Fedora base/dnf refresh.
All checks were successful
ci / changes (pull_request) Successful in 1s
ci / check (pull_request) Successful in 17s
Required
Details
ci / thinkpad-image (pull_request) Successful in 6m4s
This pull request can be merged automatically.
This branch is out-of-date with the base branch
You are not authorized to merge this pull request.
View command line instructions

Checkout

From your project repository, check out a new branch and test the changes.
git fetch -u origin thinkpad-image-promote:thinkpad-image-promote
git switch thinkpad-image-promote
Sign in to join this conversation.
No reviewers
No labels
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
chad/cn!140
No description provided.